10/29/2015 |
TURTLE |
15 mtrs. |
The first 60 mtr. were foggy, after that cristal clear. |
10/29/2015 |
TURTLE |
15 mtrs. |
The first 60 mtr. were foggy, after that cristal clear. |
2/20/2011 |
Matthi & Ineke |
5-7m |
Water was 10°C with a weak flow. Viz was milky, around 7 meters viz Water level high and pool very clear |
10/6/2010 |
MOE & DME |
10-20m |
Low flow, line is in good shape. Very little sediment in the water with no percolation. |
9/22/2010 |
Chris |
7-10m |
4 day project. Added new line all the way to the "lake", surveyed all the way from Cabouy to the lake. Removed old lines and cables. Everything is now cleaned up. |
8/15/2010 |
Anton Van Rosmalen |
30' |
We didn't have time to dive it but supposedly Cabouy has 10m of viz at the moment |